1992-1996: One of MPN’s largest projects in the 1990’s. The design of this landmark North Queensland building was required to overcome basements and footings in soft marine clays below sea level, cyclonic wind loading and storm surges, and significant landscaping loads above the casino for the original rooftop rainforest conservatory.